Sprint - Nextel 2011 Annual Report Download - page 96

Download and view the complete annual report

Please find page 96 of the 2011 Sprint - Nextel annual report below. You can navigate through the pages in the report by either clicking on the pages listed below, or by using the keyword search tool below to find specific information within the annual report.

Page out of 332

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200
  • 201
  • 202
  • 203
  • 204
  • 205
  • 206
  • 207
  • 208
  • 209
  • 210
  • 211
  • 212
  • 213
  • 214
  • 215
  • 216
  • 217
  • 218
  • 219
  • 220
  • 221
  • 222
  • 223
  • 224
  • 225
  • 226
  • 227
  • 228
  • 229
  • 230
  • 231
  • 232
  • 233
  • 234
  • 235
  • 236
  • 237
  • 238
  • 239
  • 240
  • 241
  • 242
  • 243
  • 244
  • 245
  • 246
  • 247
  • 248
  • 249
  • 250
  • 251
  • 252
  • 253
  • 254
  • 255
  • 256
  • 257
  • 258
  • 259
  • 260
  • 261
  • 262
  • 263
  • 264
  • 265
  • 266
  • 267
  • 268
  • 269
  • 270
  • 271
  • 272
  • 273
  • 274
  • 275
  • 276
  • 277
  • 278
  • 279
  • 280
  • 281
  • 282
  • 283
  • 284
  • 285
  • 286
  • 287
  • 288
  • 289
  • 290
  • 291
  • 292
  • 293
  • 294
  • 295
  • 296
  • 297
  • 298
  • 299
  • 300
  • 301
  • 302
  • 303
  • 304
  • 305
  • 306
  • 307
  • 308
  • 309
  • 310
  • 311
  • 312
  • 313
  • 314
  • 315
  • 316
  • 317
  • 318
  • 319
  • 320
  • 321
  • 322
  • 323
  • 324
  • 325
  • 326
  • 327
  • 328
  • 329
  • 330
  • 331
  • 332

Table of Contents
SPRINT NEXTEL CORPORATION
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
ultimate disposition of each of these proceedings and whether they will be resolved consistent with our beliefs, we expect that the outcome of such proceedings,
individually or in the aggregate, will not have a material adverse effect on our financial position or results of operations.
Spectrum Reconfiguration Obligations
In 2004, the FCC adopted a Report and Order that included new rules regarding interference in the 800 MHz band and a comprehensive plan to reconfigure the
800 MHz band (the “Report and Order”). The Report and Order provides for the exchange of a portion of our 800 MHz FCC spectrum licenses, and requires us to fund
the cost incurred by public safety systems and other incumbent licensees to reconfigure the 800 MHz spectrum band. In addition, we received licenses for 10 MHz of
nationwide spectrum in the 1.9 GHz band; however, we are required to relocate and reimburse the incumbent licensees in this band for their costs of relocation to another
band designated by the FCC.
The minimum cash obligation is $2.8 billion under the Report and Order. We are, however, obligated to pay the full amount of the costs relating to the
reconfiguration plan, even if those costs exceed $2.8 billion. As required under the terms of the Report and Order, a letter of credit has been secured to provide assurance
that funds will be available to pay the relocation costs of the incumbent users of the 800 MHz spectrum. We submit the qualified 800 MHz relocation costs to the FCC for
review for potential letter of credit reductions on a periodic basis. As a result of these reviews, our letter of credit was reduced from $2.5 billion at the start of the project
to $1.0 billion as of December 31, 2011, as approved by the FCC.
Total payments directly attributable to our performance under the Report and Order, from the inception of the program, are approximately $3.1 billion, of
which $252 million was incurred related to FCC licenses during 2011, before any reimbursements from the mobile satellite service (MSS) entrants. When incurred, these
costs are generally accounted for either as property, plant and equipment or as additions to FCC licenses. Although costs incurred to date have exceeded $2.8 billion, not
all of those costs have been reviewed and accepted as eligible by the Transition Administrator. Regardless, we continue to estimate that total eligible direct costs
attributable to the spectrum reconfigurations will exceed the minimum cash obligation of $2.8 billion. This estimate is dependent on significant assumptions including the
final licensee costs and costs associated with relocating licensees in the Mexican border region for which there is currently no approved border plan. In addition, we were
entitled to receive reimbursement from the MSS entrants for their pro rata portion of our costs of clearing a portion of the 1.9 GHz spectrum. As of December 31, 2011 we
received $135 million in reimbursements from MSS entrants, recognized as a reduction to FCC licenses, which satisfies all reimbursements we expect to receive.
Completion of the 800 MHz band reconfiguration was initially required by June 26, 2008. The FCC continues to grant 800 MHz public safety licensees
additional time to complete their band reconfigurations which, in turn, delays Sprint's access to some of our 800 MHz replacement channels. Accordingly, we will
continue to transition to our 800 MHz replacement channels consistent with public safety licensees' reconfiguration progress; however, we anticipate that continuing
reconfiguration progress will be sufficient to support the 800 MHz portion of Sprint’s Network Vision rollout. We completed all of our 1.9 GHz incumbent relocation and
reimbursement obligations in the second half of 2010.
Operating Leases
We lease various equipment, office facilities, retail outlets and kiosks, switching facilities and cell sites under operating leases. The non-cancelable portion of
these leases ranges from monthly up to 20 years. These leases, with few exceptions, provide for automatic renewal options and escalations that are either fixed or based on
the consumer price index. Any rent abatements, along with rent escalations, are included in the computation of rent expense calculated on a straight-line basis over the
lease term. Our lease term for most leases includes the initial non-cancelable term plus at least one renewal period, if the non-cancelable term is less than ten years, as the
exercise of the related renewal option or options is reasonably assured. Our cell site leases generally provide for an initial non-cancelable term of five to twelve years with
up to five renewal options for five years each.
F-29